Mast Strengthening work at 20 KW DRM transmitter is taken up by the Zonal Office, Guwahati. All the Guy wires, along with broken insulators are going to be replaced as part of the Mast strengthening work. Before replacing the Guy wires, verticality test of mast, guy tension etc. were measured.
Sh. M.S.ansari, ADG(E)(NEZ), Neelam Singh, DDG(E), AIR, Guwahati, Atul Gupta, DDG(E), (NEZ), & R.C.Boro,DE, AIR, Guwahati, along with other workers are seen at site during their routine visit.
Source : Rabin Boro, rabinboro8@gmail.com